Welcome to the Forum of Motor manuals and instructions.
The Leningradka reconstructed by September 1
4 stars based on
1 reviews
-
The Leningradka reconstructed by September 1
Marat Khusnullin, Deputy mayor for construction, promised that the builders will complete all work to the first day of autumn. The project "the Big Leningradka" includes reconstruction and building on Tverskaya street in Moscow, Leningradsky prospect, Moscow, Leningradskoe highway and three squares - Pushkin, triumphant and Tverskaya Zastava. Will be built in two tunnel - Alabama-Baltic and Volokolamsk. In addition, near the metro station "Sokol" appears mnogourovnevye interchange. The city authorities promise that on December 1, will also open a full along the Baltic. Now the movement is limited due to the construction of the tunnel. By the way, above the tunnel Parking will be built by 2.3 cars. After the reconstruction on the Leningrad highway appears dedicated lanes for public transport. After the reconstruction of the Stretch is complete, the Builder will begin to work on the site of the Leningrad highway from Moscow to turn on the airport "Sheremetyevo". On Leningradka in the area of the ring road will provide additional isolation. Source RIA-Novosti.
Similar Threads
-
By Auto News in forum News
0
Last Post: 13.11.2011, 23:00
-
By Auto News in forum News
0
Last Post: 31.10.2011, 11:00
-
By Auto News in forum News
0
Last Post: 23.06.2011, 14:30
-
By Auto News in forum News
0
Last Post: 23.06.2011, 13:20
-
By Auto News in forum News
0
Last Post: 14.04.2011, 15:40
Tags for this Thread